-
Connect the Connecticut Report
-
by
Scott Schwenk
—
published
May 17, 2016
—
last modified
May 17, 2016 12:43 PM
—
filed under:
North Atlantic LCC,
Conservation Design,
Landscape Conservation Design,
Connecticut River Pilot
Connect the Connecticut Report - report summarizing the process and results of the project. May 2016.
Located in
Projects
/
Connecticut River Watershed Pilot
/
Documents
-
Connecticut River Landscape Conservation Design Pilot Overview
-
by
Andrew Milliken
—
published
Feb 21, 2014
—
last modified
Mar 07, 2014 02:49 PM
—
filed under:
North Atlantic LCC,
Landscape Conservation Design
Connecticut River Landscape Conservation Design Pilot Overview
Located in
Projects
/
Connecticut River Watershed Pilot
/
About the Pilot
-
Connecticut River Pilot Core Team Agenda 2-24-14
-
by
Andrew Milliken
—
published
Feb 21, 2014
—
last modified
Feb 21, 2014 12:54 PM
—
filed under:
North Atlantic LCC,
Landscape Conservation Design
Connecticut River Pilot Core Team Agenda 2-24-14
Located in
Projects
/
…
/
Connecticut River Pilot Core Team
/
Connecticut River Pilot Core Team Meeting 02-24-2014
-
Connecticut River Watershed Pilot Core Team Meeting Attendee List 2-24-14
-
by
Andrew Milliken
—
published
Feb 23, 2014
—
last modified
Feb 23, 2014 07:42 PM
—
filed under:
North Atlantic LCC,
Landscape Conservation Design
Core Team members and guests expected to attend Connecticut River Watershed Pilot Core Team Meeting February 24 in Turners Falls, MA
Located in
Projects
/
…
/
Connecticut River Pilot Core Team
/
Connecticut River Pilot Core Team Meeting 02-24-2014
-
Description of Geophysical Settings TNC Resilient Landscapes (April 2014)
-
by
Andrew Milliken
—
published
Apr 25, 2014
—
last modified
Aug 05, 2014 03:41 PM
—
filed under:
Landscape Conservation Design
Description of Geophysical Settings TNC Resilient Landscapes excerpt from Anderson et al.
Located in
Projects
/
Connecticut River Watershed Pilot
/
Documents
-
Document and Maps: Landscape Capability and Vulnerability Table and Maps (05-30-2014)
-
by
mmallek
—
published
Jul 30, 2014
—
last modified
Jul 30, 2014 09:17 AM
—
filed under:
Landscape Conservation Design,
Connecticut River Pilot
One document including one table and 21 maps (PDF). The table includes statistics for each representative species on the current landscape capability in the Northeast region and the Connecticut River watershed. Maps of landscape capability in 2010 are included for the following species: American woodcock, Black bear, Blackburnian warbler, Blackpoll warbler, Eastern meadowlark, Louisiana waterthrush, Marsh wren, Northern waterthrush, Wood thrush. Maps of landscape capability in 2080 and the change from 2010 to 2080 are included for some of those species.
Located in
Projects
/
…
/
Terrestrial and Wetland Technical Subteam
/
May 30, 2014 Subteam Meeting (Terrestrial/Wetland)
-
Document: Action Items and Meeting Notes 01-15-2014
-
by
mmallek
—
published
Jul 30, 2014
—
last modified
Jul 30, 2014 01:29 PM
—
filed under:
North Atlantic LCC,
Landscape Conservation Design
Action items from preliminary Connecticut River Pilot meeting and notes from the day.
Located in
Projects
/
…
/
Connecticut River Pilot Core Team
/
Connecticut River Pilot - FWS Members Meeting 01-15-2014
-
Document: Connecticut River Watershed Landscape Conservation Design Pilot: Suggestions for Setting Population Objectives (05-30-2014)
-
by
Andrew Milliken
—
published
May 30, 2014
—
last modified
Jul 30, 2014 09:17 AM
—
filed under:
Landscape Conservation Design,
Connecticut River Pilot
Connecticut River Watershed Landscape Conservation Design Pilot:
Suggestions for Setting Population Objectives 5-30-14
Located in
Projects
/
…
/
Terrestrial and Wetland Technical Subteam
/
May 30, 2014 Subteam Meeting (Terrestrial/Wetland)
-
Document: Potential Criteria for Prioritizing Wildlife Species in Conservation Design (05-30-2014)
-
by
Andrew Milliken
—
published
May 30, 2014
—
last modified
Jul 30, 2014 09:17 AM
—
filed under:
Landscape Conservation Design,
Connecticut River Pilot
Potential Criteria for Prioritizing Wildlife Species in Conservation Design 5-30-14
Located in
Projects
/
…
/
Terrestrial and Wetland Technical Subteam
/
May 30, 2014 Subteam Meeting (Terrestrial/Wetland)
-
Document: Process and Decisions for Design on the Connecticut River Pilot Project
-
by
mmallek
—
published
Aug 28, 2014
—
last modified
Aug 28, 2014 09:54 AM
—
filed under:
Landscape Conservation Design,
Connecticut River Pilot
This document includes the key decisions made through August 2014 on the Connecticut River Pilot Landscape Conservation Design Project. Where available, details such as the meeting at which we reached consensus, options considered, and associated documents are included.
Located in
Projects
/
…
/
Connecticut River Pilot Core Team
/
Connecticut River Pilot Core Team Meeting 08-28-2014