-
Webinar: Audio and Video from July Core Team Meeting
-
Recording of the morning Connecticut River Pilot Core Team Meeting on July 25, 2014.
Located in
Projects
/
…
/
Connecticut River Pilot Core Team
/
Connecticut River Pilot Core Team Meeting 07-25-2014
-
Core Team Subgroup Members
-
Subteam assignments based on response to Feb 24, 2104 Core Team meeting request to “self-assign” to a subteam. Last updated 03-28-2014.
Located in
Projects
/
Connecticut River Watershed Pilot
/
Connecticut River Pilot Core Team
-
Document and Maps: Landscape Capability and Vulnerability Table and Maps (05-30-2014)
-
One document including one table and 21 maps (PDF). The table includes statistics for each representative species on the current landscape capability in the Northeast region and the Connecticut River watershed. Maps of landscape capability in 2010 are included for the following species: American woodcock, Black bear, Blackburnian warbler, Blackpoll warbler, Eastern meadowlark, Louisiana waterthrush, Marsh wren, Northern waterthrush, Wood thrush. Maps of landscape capability in 2080 and the change from 2010 to 2080 are included for some of those species.
Located in
Projects
/
…
/
Terrestrial and Wetland Technical Subteam
/
May 30, 2014 Subteam Meeting (Terrestrial/Wetland)
-
Presentation: Aquatics - Landscape Conservation Design
-
Designing Sustainable Landscapes in the Northeast: A project of the NALCC and the Northeast Climate Science Center. Landscape Conservation Design, July 2014. Presentation for afternoon Aquatics Subteam breakout session.
Located in
Projects
/
…
/
Aquatic Technical Subteam
/
Aquatic Subteam Meeting 07-25-2014
-
Core Team Survey Results
-
Connecticut River Pilot Core Team Survey Results, as of July 25.
Located in
Projects
/
Connecticut River Watershed Pilot
/
About the Pilot
-
Agenda: Connecticut River Pilot Core Team Meeting 06-27-2014
-
Agenda, Handouts and Presentation for June 27, Core Team Meeting in Hadley, Massachusetts from 10:00 a.m. to 2:00 p.m.
Located in
Projects
/
…
/
Connecticut River Pilot Core Team
/
Connecticut River Pilot Core Team Meeting 06-27-2014
-
Document: Potential Criteria for Prioritizing Wildlife Species in Conservation Design (05-30-2014)
-
Potential Criteria for Prioritizing Wildlife Species in Conservation Design 5-30-14
Located in
Projects
/
…
/
Terrestrial and Wetland Technical Subteam
/
May 30, 2014 Subteam Meeting (Terrestrial/Wetland)
-
Document: Connecticut River Watershed Landscape Conservation Design Pilot: Suggestions for Setting Population Objectives (05-30-2014)
-
Connecticut River Watershed Landscape Conservation Design Pilot:
Suggestions for Setting Population Objectives 5-30-14
Located in
Projects
/
…
/
Terrestrial and Wetland Technical Subteam
/
May 30, 2014 Subteam Meeting (Terrestrial/Wetland)
-
Presentation: Updates on Ecological Integrity and Selecting Tiered Core Areas Based on Species
-
DSL Presentation for 5-30-14 Core Team Meeting by Kevin McGarigal, UMass with updates on ecological integrity and description of landscape capability
Located in
Projects
/
…
/
Connecticut River Pilot Core Team
/
Connecticut River Pilot Core Team Meeting 05-30-2014
-
TNC Freshwater Ecosystem Resilience
-
Located in
Projects
/
…
/
Aquatic Technical Subteam
/
Aquatic Subteam Meeting 05-08-2014